********************************* EMI Test Report Template ********************************* - Product: StoRM SE - Release Task: http://savannah.cern.ch/task/?23338 - ETICS Subsystem Configuration Name: emi-storm_R_EMI2RC4 - VCS Tag: emi-storm-backend-mp_R_1_1_0_1, emi-storm-frontend-mp_R_1_1_0_1, emi-storm-globus-gridftp-mp_R_1_1_0_1, BE_1.9.0-2, DIP-1.7.4-3, FE_1.8.0-5, GDSI_1.2.0-4, GHTTPS_1.1.0-1, yaim-storm_4.2.1-1 - EMI Major Release: EMI2 RC4 (Matterhorn) - Platforms: SL5 - Author: Alessio Gianelle - Date: 12nd April 2012 - Test Report Template : v. 3.2 ************* Summary ************* 1. Deployment tests: 1.1. Clean Installation - PASS 1.2. Upgrade Installation - PASS 2. Static Code Analysis - NA 3. Unit Tests Execution - NO 4. System tests: 4.1. Functionality tests - PASS 4.2. Regression tests - PASS 4.3. Standard Conformance tests - NA 4.4. Performance tests - NA 4.5. Scalability tests - NA 4.6. Integration tests - NA REMARKS: Unit and regression tests should be run in the final release. Task description is not completed. Known problems: https://wiki.italiangrid.it/twiki/bin/view/IGIRelease/EMI2-RC4#Known_problems *************************** Detailed Testing Report *************************************** 1. Deployment log ************************ 1.1. Clean Installation ----------------------------- - YUM/APT Testing Repo file contents: https://twiki.cern.ch/twiki/pub/EMI/EMI-2/emi-2-rc4-sl5.repo - YUM/APT Install command: yum install emi-storm-backend-mp emi-storm-globus-gridftp-mp emi-storm-gridhttps-mp - YUM/APT log: https://wiki.italiangrid.it/twiki/pub/IGIRelease/Task23338-RC4/storm-sl5install.txt - Configuration log: https://wiki.italiangrid.it/twiki/pub/IGIRelease/Task23338-RC4/storm-sl5install.txt 1.2. Upgrade Installation -------------------------------- - YUM/APT Production Repo file contents: http://emisoft.web.cern.ch/emisoft/dist/EMI/1/sl5/repos/emi1-base.repo http://emisoft.web.cern.ch/emisoft/dist/EMI/1/sl5/repos/emi1-updates.repo http://emisoft.web.cern.ch/emisoft/dist/EMI/1/sl5/repos/emi1-third-party.repo - YUM/APT Install command: yum install emi-storm-backend-mp emi-storm-globus-gridftp-mp emi-storm-gridhttps-mp - YUM/APT Testing Repo file contents: https://twiki.cern.ch/twiki/pub/EMI/EMI-2/emi-2-rc4-sl5.repo - YUM/APT Upgrade command: yum update - YUM/APT log: https://wiki.italiangrid.it/twiki/pub/IGIRelease/Task23338-RC4/storm-sl5update.txt - Configuration log: https://wiki.italiangrid.it/twiki/pub/IGIRelease/Task23338-RC4/storm-sl5update.txt 2. Static Code Analysis ****************************** - URL where static code analysis results can be accessed 3. Unit Tests ***************** - URL pointing to the results of the Unit Tests. - Code Coverage %, if available. 4. System tests ********************* - URL where the tests/testsuite can be accessed: http://storm.forge.cnaf.infn.it/repository/internal/tstorm-1.2.0-5.linux-x86_64.tar.gz - URL where the test results can be accessed: https://wiki.italiangrid.it/twiki/bin/view/IGIRelease/Task23338-RC4 OR please, use the template below to include the test results in this document: --------------- System Test Summary ------------------ For each Basic Functionality test, please include the following summary: * Description of the test: * Result: PASSED/FAILED: For each Regression test, please include the following summary: * Description of the test: * Test Unique ID/RfC unique ID: * Result: PASSED/FAILED: For each of Performance and Scalability tests, please include the following summary: * Description of the test: * Description of the specific context: * Result: PASSED/FAILED: For each Standards Compliance/Conformance test, please include the following summary: * Description of the test: * Adopted Standard: * Result: PASSED/FAILED: For each Integration test, please include the following summary: * Description of involved components and testbed setup: * Description of the test: * Description of the specific context: * Result: PASSED/FAILED: 4.1. Basic Functionality tests ************************************* For each test: COPY & PASTE TEST OUTPUT. 4.2. Regression tests ***************************** For each test: COPY & PASTE TEST OUTPUT. 4.3. Standard Conformance tests ****************************************** For each test: COPY & PASTE TEST OUTPUT. 4.4. Performance tests ******************************* For each test: COPY & PASTE TEST OUTPUT. 4.5. Scalability tests ************************** For each test: COPY & PASTE TEST OUTPUT. 4.6. Integration tests ************************** For each test: COPY & PASTE TEST OUTPUT. ---------------End of System Test Summary ------------------